Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | Yansong |
Model Number : | PM-082 |
Certification : | ISO9001:2008 |
Price : | Negotiable |
Payment Terms : | T/T 50% as deposit 50% before shipment |
Supply Ability : | 1500-2000pcs per month |
Delivery Time : | Normally, simple parts, 5-7 days, complicated parts, 7-15 days. According to QTY and the complexity of drawing. |
Product name | High Precision Progressive Die and Stamping SKD11 Material |
Tooling steel material | Depend on product, we help customer to choose the suitable
material. Commonly used material as below: Carbide(CD650,V3,KD20), ASP-23, ASP-60, S55C---45#55, SKD11. |
Steel of mold base | Depend on product, we help customer to choose the suitable
material. Commonly use S45C. |
Mould Standard components | HASCO, MISUMI, Meusburger, DME, etc. |
Die concept | 2-Plate Die, 3-Plate Die, Module Die |
Mold life | Depends on the steel material and your requests. Commonly used: 50 Million to 300 Million Times |
Stamping Product | PC Terminal, Power terminal, Press-Fit Terminal, Lead frame, SIM Spring, Connector Shield, Battery, Metal USB shell, custom stamping. |
Surface finish | Depends on your requirements. Commonly: Texture Hatching, EDM Hatching, plating, Polishing, Diamoud Polishing, Mirror Polishing and so on. |
Delivery time | Depends on the size and structure. Normally: 25-30 working days after 50% down payment. |
Terms of payment | T/T, L/C, Western Union, D/A, D/P, Paypal. |
Machine center | High speed CNC, Wire cutting, EDM, Grinder, Great Grinder, CNC milling, Drilling and milling, Stamping punching machines, injection machine, Inspection. |
R&D | 1. Drawing design and making for products and mold; 2. Mold drawing revising; 3. Production time and quality control in each machining process. (Our own EPR system). |
Production | Pilot Run production and molding production can be provided. |
![]() |